Tuesday, July 10, 2012

The box is ready for the cooling unit....

The drain is back in.....I put the 786 in the corners and sides of the bottom of the drain pan....Feet are finished and I replaced the bad clear covering on the door wiring. It was all brittle and cracked. I cut it off and replaced it with 2 layers of clear 1/2" heat shrink that I got at Fry's for $2.79  It looks like I'll end up with between $150 and $200 in it when I'm done.  Plans are to repaint the kitchen and turn it into a Coca-Cola kitchen and bring the machine up to the big house.






No comments:

Post a Comment